Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Open the Equipment record that should have a Back Connection set up. In this example, a Switch with an Equipment ID of "Back Connection Test Switch One" is used. 
    Equipment ID field exampleImage RemovedEquipment ID Test Switch One exampleImage Added
  2. In the Destination Equipment picker the Patch Panel "Back Connection TwoTest Patch Panel One" is selected.
  3. This makes the Destination Port/Pin/Len picker Required.
    Back Connect field exampleImage RemovedImage Added
  4. Click on the Destination Port/Pin/Len Picker and select a PPL.
    Image RemovedDestination PPL field with PPL selected exampleImage Added
    • A User could instead select the Destination Port/Pin/Len record and have the Destination Equipment picker automatically fill in.
      Image RemovedManage PPL form with Back Connect exampleImage Added
  5. Save the PPL record.
    Manage Equipment Form exampleImage RemovedPPL record on Test Switch One exampleImage Added
  6. The Switch Back Connection "Test Switch One" will now reflect the Back Connection in the Ports/Pins/Lens tab of the saved PPL record. 
  7. The Port/Pin/Len (PPL) records for both pieces of Equipment reflect the 'Back Connection'.
    • On the PPL tab of the Patch Panel Back Connection Two "Test Patch One" in the grid.
      Manage Equipment Form exampleImage RemovedTest Patch Panel One on PPL tab exampleImage Added
    • Also on the opened PPL record.
      Image RemovedManage PPL form with Back Connect exampleImage Added

The two pieces of Equipment are now linked with a Back Connection.

...